Promise tracker

Tracking delivery on manifesto promises

This record covers testable commitments extracted from published manifestos. Each assessment links to its source evidence and can be challenged.

Promises tracked

235

Assessment coverage

234 of 235 (100%)

Unassessed promises are shown separately and are never excluded from the total.

Latest automated assessment

4 Sept 2026

Assessments are not editorial endorsements.

Manifesto scope

Showing NPP 2024. Choose a manifesto to see an assessment in context.

Open manifesto

Delivery summary

Of 234 assessed promises: 8 delivered, 34 partly delivered, 184 under way, 5 stalled, and 3 not delivered.

Scope: NPP 2024

Refine this list

Promises

235 results

What the labels mean
Delivered
Delivered substantially as promised.
Partly delivered
Partly delivered, or delivered in a weakened form.
Under way
Underway, with visible progress but no outcome yet.
Stalled
Started or announced, then stopped moving.
Not delivered
Abandoned, reversed, or acted against.
Not assessed
Extracted from the manifesto but not yet assessed.
DeliveredConfidenceHighCost of Living & Crisis
NPP-2024-P-235

Increase the salaries of upcountry plantation workers compared to the cost of living.

Why this status: Delivered substantially as promised. The 2026 Budget raised the basic daily wage from Rs. 1,350 to Rs. 1,550 and added a Rs. 200 attendance incentive; the President's Office later reported a Rs. 1,750 daily wage. The basic-wage increase (+14.8%) and full attended-day package (+29.6%) both exceeded the CCPI increase from 190.9 in September 2024 to 208.8 in August 2026 (+9.4%), using DCS's 2021=100 series. Caveat: the Rs. 200 is attendance-dependent, is not EPF-eligible, and Parliament said its MoU-based mechanism needs a stronger legal footing. The pledge called for wages to rise relative to living costs, not a permanent automatic-indexation formula.

5 evidence sources · statistics.gov.lk, media.gov.lk + more · latest 31 Aug 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (4)

  • Official release30 Sept 2024
    DCS reported the all-items CCPI (base 2021=100) at 190.9 in September 2024.
  • Budget document7 Nov 2025
    The 2026 Budget proposed increasing the estate-sector minimum daily wage from Rs. 1,350 to Rs. 1,550 from January 2026, plus a Rs. 200 daily attendance incentive funded by government.
  • The President's Office stated on 1 May 2026 that plantation workers' wages had been increased to Rs. 1,750.
  • Official release31 Aug 2026
    DCS reported the all-items CCPI (base 2021=100) at 208.8 in August 2026.

Evidence against (1)

  • Official release24 Feb 2026
    Parliament's Committee on Public Finance said the Rs. 200 attendance allowance was MoU-based rather than gazetted, did not qualify for EPF contributions, and required a proper legal framework.
Under wayConfidenceHighCorruption & Accountability
NPP-2024-P-234

Establish a Commission Against Discrimination with a legal mandate.

Why this status: An official government policy or Cabinet decision directly addresses this commitment. It is evidence of a formal implementation direction, but not proof of nationwide completion, so it remains in the works.

1 evidence source · cabinetoffice.gov.lk · latest 3 Mar 2025Full assessment
Status assessed by AI on 4 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • The policy lists establishing a Commission Against Discrimination with a legal mandate.

Evidence against (0)

None found.

Under wayConfidenceHighRights, Justice & Society
NPP-2024-P-233

Introduce a new constitution that strengthens democracy and ensures equality of all citizens.

Why this status: Under way. The Government says it is considering earlier constitutional-reform reports and proposals, after which it will take a basic concept paper to Cabinet, present a draft to the public, revise it through dialogue and seek referendum approval. That is a defined drafting process, but no new constitution has yet been enacted.

1 evidence source · pm.gov.lk · latest 19 Dec 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official release19 Dec 2025
    The Prime Minister said in December 2025 that prior constitutional-reform reports were being considered before a concept paper goes to Cabinet, followed by a public draft, consultation and a referendum.

Evidence against (0)

None found.

DeliveredConfidenceHighCost of Living & Crisis
NPP-2024-P-232

Introduce a retirement pension system for foreign employed citizens.

Why this status: Delivered substantially as promised. The 2026 Budget introduced a contributory pension scheme for foreign workers, and the Social Security Board now describes a jointly implemented migrant-worker pension scheme with monthly retirement, survivor and disability benefits for registered overseas workers.

2 evidence sources · media.gov.lk, ssb.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (2)

  • Budget document7 Nov 2025
    The 2026 Budget states that a contributory pension scheme for foreign workers is being introduced and that the Bureau of Foreign Employment will complete the basic implementation work within 2026.
  • Official releaseDate not recorded
    The Social Security Board describes a migrant-workers pension scheme being implemented jointly with the Foreign Employment Bureau, offering a monthly pension from age 60 plus survivor and disability benefits.

Evidence against (0)

None found.

Under wayConfidenceHighMacroeconomy & IMF
NPP-2024-P-231

Enact a modern investment law to streamline business procedures and improve access to finance for SMEs.

Why this status: Modern investment-law reform is advancing but not complete. The 2026 Budget reports FDI-streamlining amendments to existing investment laws and planned PPP and Investment Protection Acts; it also proposes an expanded enhanced-capital-allowance threshold for SMEs. The promised single modern law that streamlines business procedures and improves SME access to finance was not shown as enacted, so this is an active reform programme rather than a fulfilled pledge.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget reports FDI-streamlining amendments, planned PPP and Investment Protection Acts, and a lower enhanced-capital-allowance investment threshold for SMEs.

Evidence against (0)

None found.

Not deliveredConfidenceHighRights, Justice & Society
NPP-2024-P-230

Abolish the executive presidency and appoint a non-executive president by 2025.

Why this status: Not delivered by the pledged 2025 deadline. The Government stated in December 2025 that abolition of the executive presidency would be undertaken through the future new-constitution process, while the Presidential Secretariat currently identifies the officeholder as Sri Lanka's Executive President. The constitutional change has not occurred.

2 evidence sources · pm.gov.lk, presidentsoffice.gov.lk · latest 19 Dec 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (0)

None found.

Evidence against (2)

  • Official release19 Dec 2025
    In December 2025, the Prime Minister said abolishing the executive presidency and appointing a president without executive powers would be undertaken during the new-constitution drafting process.
  • Official releaseDate not recorded
    The Presidential Secretariat currently identifies Anura Kumara Dissanayake as the 9th Executive President of Sri Lanka.
Under wayConfidenceHighCorruption & Accountability
NPP-2024-P-229

Establish an Anti-Corruption Commission office in every district by 2026.

Why this status: Under way, but not complete. Parliament reported plans for CIABOC to establish district-level offices, initially aiming for at least nine provincial offices. That is an implementation step toward local access, but it falls short of evidence that an office has been established in every district by the pledge's 2026 deadline.

1 evidence source · parliament.lk · latest 10 Mar 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official release10 Mar 2026
    Parliament reported in March 2026 that CIABOC planned district-level offices, with an initial aim of establishing at least nine provincial offices.

Evidence against (0)

None found.

Not deliveredConfidenceHighIndustry & Trade
NPP-2024-P-228

Implement an electronic bidding system in the construction sector by 2025.

Why this status: The 2025 deadline was missed. The 2026 Budget still describes creation of an e-procurement system as a reform being implemented, rather than a completed electronic bidding system. A 2026 Government procurement notice expressly states that electronic procurement is not permitted for that tender. This does not rule out isolated electronic submissions, but it is strong evidence that the promised construction-sector electronic bidding system was not implemented by 2025.

2 evidence sources · media.gov.lk, dmc.gov.lk · latest 4 Mar 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (0)

None found.

Evidence against (2)

  • Budget document7 Nov 2025
    The 2026 Budget says an e-procurement system is being created as part of public-finance digitalization.
  • A 2026 Disaster Management Centre procurement notice states that electronic procurement will not be permitted and requires physical proposal delivery.
Under wayConfidenceHighMacroeconomy & IMF
NPP-2024-P-227

Expand the harbour infrastructure to increase capacity by 30% by 2027.

Why this status: Under way. The 2026 Budget commits to capacity and efficiency projects at Colombo Port, including Western Container Terminal Phase II, feasibility studies for ports logistics centres and the proposed Colombo North Port Development Project. The sources do not yet demonstrate the promised 30 percent capacity increase by 2027.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget says it expects to enhance Colombo Port capacity and operational efficiency through Western Container Terminal Phase II, logistics-centre feasibility studies and the proposed Colombo North Port Development Project.

Evidence against (0)

None found.

Not deliveredConfidenceHighInfrastructure & State Assets
NPP-2024-P-226

Introduce a digital mobile phone app for para-transit transport services by 2025.

Why this status: The pledge set a 2025 deadline. Official transport material from 2026 documents an information app for a disability-priority bus pilot, not a mobile app for para-transit services. No official record was found of the promised para-transit app having been introduced by the deadline; the deadline-specific promise is therefore assessed as broken.

1 evidence source · presidentsoffice.gov.lk · latest 21 Apr 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (0)

None found.

Evidence against (1)

  • Official release21 Apr 2026
    The 2026 accessible-bus pilot launched the LMT GO app for bus information; it does not document the promised para-transit mobile service.
Partly deliveredConfidenceHighInfrastructure & State Assets
NPP-2024-P-225

Establish a national e-mobility secretariat to develop a national EV charging network by 2025.

Why this status: Partly delivered, after the stated deadline. PUCSL introduced a mandatory regulatory framework for EV-charging service providers in January 2026, advancing the charging ecosystem. However, no official evidence found establishes the promised national e-mobility secretariat or a completed national EV-charging network by 2025.

2 evidence sources · pucsl.gov.lk · latest 6 Jan 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • PUCSL introduced a mandatory E-Mobility Service Provider registration framework in January 2026 for digital EV-charging services, covering consumer protection, interoperability, data integrity and regulatory oversight.

Evidence against (1)

  • The January 2026 framework regulates E-Mobility Service Providers; it does not evidence a national e-mobility secretariat or a completed national charging network by the pledge's 2025 deadline.
Partly deliveredConfidenceHighIndustry & Trade
NPP-2024-P-224

Implement a collateral-free loan scheme of up to Rs. 10 million for micro, small, and medium-scale entrepreneurs.

Why this status: Government-backed collateral-free MSME credit is operating through the National Credit Guarantee Institution, with more than Rs. 4.027 billion granted by 2025. However, the public evidence does not verify the promised scheme’s specific availability of loans up to Rs. 10 million per entrepreneur.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget reported that more than Rs. 4.027 billion in collateral-free loans had been granted under the National Credit Guarantee Institution by 2025, with further credit guarantees planned.

Evidence against (0)

None found.

Under wayConfidenceHighInfrastructure & State Assets
NPP-2024-P-223

Increase the capacity and accessibility of the National Archive by establishing an efficient archival system and public record management using modern technologies such as Block Chain, Cloud and AI.

Why this status: The Government adopted a National Policy on Archives and Records Management in April 2025 and directed preparation of a replacement Archives and Records Management Bill. The National Archives says the policy encourages new technologies to improve access and transparency. This is a meaningful institutional foundation, but there is no evidence yet of the pledged blockchain, cloud and AI-enabled archival system or a completed capacity/access expansion, so it remains underway.

2 evidence sources · archives.gov.lk, cabinetoffice.gov.lk · latest 7 Apr 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (2)

  • The National Archives records Cabinet concurrence for the National Policy on Archives and Records Management on 7 April 2025 and says the policy encourages new technologies to improve access and transparency.
  • Cabinet approved the archives and records-management policy and instructed the Legal Draftsman to prepare a Bill replacing the 1973 Archives Act and its 1981 amendment.

Evidence against (0)

None found.

Under wayConfidenceHighPolicy & Legislation
NPP-2024-P-222

Use modern engineering technology to save mangroves and coastal environmental systems and reduce coastal erosion.

Why this status: There is a funded coastal-erosion intervention: the 2026 Budget allocates Rs. 100 million for an immediate practical and permanent solution to coastal erosion at the Kalu River lagoon. This is relevant implementation, but the official evidence does not yet document the promised modern engineering approach, mangrove protection, or a programme covering coastal ecosystems nationally. It is therefore progress, not completion.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget allocates Rs. 100 million for an immediate practical and permanent solution to prevent coastal erosion associated with the Kalu River lagoon, restore fisheries activity, and revive tourism.

Evidence against (0)

None found.

Under wayConfidenceHighAgriculture & Food Security
NPP-2024-P-221

Introduce necessary technologies to minimize post-harvest damage and increase diversification of agricultural, maritime, and freshwater products.

Why this status: The Government has funded practical post-harvest-loss measures: modern paddy drying machinery for relevant farmer companies or cooperatives, and Rs. 500 million for fishing-wharf infrastructure specifically to minimize post-harvest losses. These are concrete starts in agricultural and maritime supply chains. Public evidence does not yet demonstrate a wider technology rollout, freshwater-product coverage, or increased product diversification, so the pledge remains underway.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget proposes modern paddy dryers and allocates Rs. 500 million for wharf infrastructure to obtain better fish harvests by minimizing post-harvest losses.

Evidence against (0)

None found.

Under wayConfidenceHighPolicy & Legislation
NPP-2024-P-220

Implement suitable methods, identified by research and development-based pilot projects, to minimize human-animal conflicts.

Why this status: Cabinet considered a comprehensive programme to reduce wild-animal damage to crops and livelihoods, developed with input from universities, farmers, environmental groups and public bodies, and established a ministerial review mechanism. The public record does not yet show the promised R&D-pilot methods being adopted, so this remains in progress.

1 evidence source · cabinetoffice.gov.lk · latest 3 Mar 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Cabinet considered a comprehensive programme to manage crop and livelihood damage from wild animals, prepared with input from universities, farmer organisations, environmental groups, NGOs and relevant agencies.

Evidence against (0)

None found.

Partly deliveredConfidenceHighPublic Sector & Unions
NPP-2024-P-219

Establish a technical task force with specialist knowledge in Information Technology (IT), Big Data, Machine Learning, AI, Communication & Networking, and social media to encourage local entrepreneurs.

Why this status: The government says it established a 30-member Digital Task Force, and separately budgeted a Start-Up Fund with AI, cloud and digital-infrastructure support. But the recorded task force is under education reforms, and the public source does not demonstrate the full promised specialist composition or a direct mandate to encourage local entrepreneurs. This is partial rather than full delivery.

1 evidence source · pmoffice.gov.lk · latest 14 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official release14 Nov 2025
    At Global Entrepreneurship Week 2025, the Prime Minister said the government had established a 30-member Digital Task Force under education reforms and allocated Rs. 1.5 billion for a Start-Up Fund, alongside AI and cloud-computing research support.

Evidence against (0)

None found.

Partly deliveredConfidenceHighRights, Justice & Society
NPP-2024-P-218

Establish necessary systems, mechanisms, and tools to integrate the elderly community and people with disabilities into the national workforce.

Why this status: The government has launched a disability employment matching programme with employer participation and a 50% wage subsidy for up to 24 months. This is a concrete workforce-integration mechanism for persons with disabilities. However, no comparable national mechanism is evidenced for integrating older people into the workforce, so the combined pledge is only partly delivered.

1 evidence source · nspd.gov.lk · latest 22 May 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official release22 May 2026
    The National Secretariat for Persons with Disabilities launched a programme matching jobseekers with disabilities to employers, with a government wage subsidy of 50% of salary up to Rs. 15,000 for up to 24 months.

Evidence against (0)

None found.

Under wayConfidenceHighInfrastructure & State Assets
NPP-2024-P-217

Establish 'Technology Development Centers' in selected districts.

Why this status: A Technology Service and Support Centre (technology incubation centre) was opened at the University of Vavuniya in January 2026 to transfer technology and support SMEs and entrepreneurs in the Northern Province. It is concrete delivery of the model, but the pledge calls for centres in selected districts and no national rollout count is yet verified.

1 evidence source · most.gov.lk · latest 23 Jan 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official release23 Jan 2026
    The Ministry of Science and Technology announced the opening of a Technology Service and Support Centre at the University of Vavuniya to support entrepreneurship, invention, commercialisation and SMEs in the Northern Province.

Evidence against (0)

None found.

Under wayConfidenceMediumInfrastructure & State Assets
NPP-2024-P-216

Deploy proper waste disposal bins and facilities to reduce environmental pollution by e-waste and promote recycling.

Why this status: An e-waste collection centre has been opened by Colombo Municipal Council and the Western Province Waste Management Authority, providing a concrete recycling facility. The evidence is local rather than national and does not demonstrate broad deployment of bins and facilities, so this is assessed as early progress only.

1 evidence source · colombo.mc.gov.lkFull assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Official releaseDate not recorded
    Colombo Municipal Council and the Western Province Waste Management Authority opened an e-waste collection centre at the Havelock Road–Park Road junction.

Evidence against (0)

None found.

Under wayConfidenceHighIndustry & Trade
NPP-2024-P-215

Establish tissue culture and genetic engineering centres and laboratories to develop marketable products such as herbal medicines, nutraceuticals, food supplements, and cosmeceuticals.

Why this status: The policy directly commits to tissue-culture and genetic-engineering centres and laboratories for marketable herbal, nutraceutical and cosmeceutical products. No nationwide completion evidence is shown.

1 evidence source · cabinetoffice.gov.lk · latest 3 Mar 2025Full assessment
Status assessed by AI on 4 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • The policy lists establishing tissue culture and genetic engineering centres and laboratories to develop herbal medicines, nutraceuticals, food supplements and cosmeceuticals.

Evidence against (0)

None found.

Under wayConfidenceHighPolicy & Legislation
NPP-2024-P-214

Establish a national commission to manage and conduct proper research and development in indigenous medicine.

Why this status: The policy directly commits to a national commission to manage and conduct research and development in indigenous medicine. No evidence shows the commission is operational.

1 evidence source · cabinetoffice.gov.lk · latest 3 Mar 2025Full assessment
Status assessed by AI on 4 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • The policy lists establishing a national commission to manage and conduct proper research and development in indigenous medicine.

Evidence against (0)

None found.

Under wayConfidenceHighPolicy & Legislation
NPP-2024-P-213

Implement research and development-based solutions to promote inquiry-based learning in school education.

Why this status: The education system has established a research advisory committee, approved school-based research studies, and begun an action-research journal and school research activities. These are credible R&D foundations, but official material does not yet demonstrate system-wide adoption of inquiry-based learning methods.

1 evidence source · moe.gov.lk · latest 1 Jan 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • The Ministry’s 2025 progress report records a Research Advisory Committee, School Research Week instructions, approval of school-based research studies, and steps to publish the action-research journal Inquire & Inspire.

Evidence against (0)

None found.

Under wayConfidenceHighAgriculture & Food Security
NPP-2024-P-212

Develop alternative local food products to increase the nutrition levels of children.

Why this status: The Health Ministry reports a rice-based Thriposha alternative was piloted for children with moderate acute malnutrition, and fortified rice in the school-meal programme began scaling to 12 districts from January 2025. This is research- and pilot-based activity relevant to the pledge, but not proof that a new local-food solution has been fully implemented nationwide.

1 evidence source · health.gov.lk · latest 1 Jan 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • The Ministry reported a feasibility pilot of rice-based Thriposha as an alternative to corn-based product, and the scale-up of locally blended fortified rice to school meals in 12 districts from January 2025.

Evidence against (0)

None found.

Partly deliveredConfidenceHighAgriculture & Food Security
NPP-2024-P-211

Increase the accuracy of methods to identify fish-rich areas, use solar and LNG-powered vessels, provide larger vessels with storage facilities, and modernize vessels and fishing equipment.

Why this status: One defined part is funded: the 2026 Budget allocates Rs. 100 million for a satellite-based system to identify fish grounds and communicate that information to fishers. That directly advances the promise's fish-area identification element. The official evidence does not show solar/LNG vessels, larger cold-storage vessels, or broad equipment modernization, so the overall multi-part pledge is only partially delivered.

1 evidence source · media.gov.lk · latest 7 Nov 2025Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (1)

  • Budget document7 Nov 2025
    The 2026 Budget allocates Rs. 100 million to develop a system that identifies fish grounds with satellite technology and communicates the information efficiently to the fishing community.

Evidence against (0)

None found.

Page 1Next →
How assessments are made

One model assembles a fixed evidence file from statements and official documents. A second model assesses the promise from that evidence file, so it cannot choose the evidence that supports its own conclusion.

A promise without evidence remains unassessed. Assessments are automatically published, not editorially reviewed, and every rated promise includes its date, assessor, sources, and a route to dispute the record.