Promise tracker

Tracking delivery on manifesto promises

This record covers testable commitments extracted from published manifestos. Each assessment links to its source evidence and can be challenged.

Promises tracked

235

Assessment coverage

234 of 235 (100%)

Unassessed promises are shown separately and are never excluded from the total.

Latest automated assessment

4 Sept 2026

Assessments are not editorial endorsements.

Manifesto scope

Showing all imported manifestos. Choose a manifesto to see an assessment in context.

Delivery summary

Of 234 assessed promises: 8 delivered, 34 partly delivered, 184 under way, 5 stalled, and 3 not delivered.

Scope: all imported manifestos

Refine this list

Promises

1 result · Not delivered · Industry & Trade

What the labels mean
Delivered
Delivered substantially as promised.
Partly delivered
Partly delivered, or delivered in a weakened form.
Under way
Underway, with visible progress but no outcome yet.
Stalled
Started or announced, then stopped moving.
Not delivered
Abandoned, reversed, or acted against.
Not assessed
Extracted from the manifesto but not yet assessed.
Not deliveredConfidenceHighIndustry & Trade
NPP-2024-P-228

Implement an electronic bidding system in the construction sector by 2025.

Why this status: The 2025 deadline was missed. The 2026 Budget still describes creation of an e-procurement system as a reform being implemented, rather than a completed electronic bidding system. A 2026 Government procurement notice expressly states that electronic procurement is not permitted for that tender. This does not rule out isolated electronic submissions, but it is strong evidence that the promised construction-sector electronic bidding system was not implemented by 2025.

2 evidence sources · media.gov.lk, dmc.gov.lk · latest 4 Mar 2026Full assessment
Status assessed by AI on 2 Sept 2026. Not editorially reviewed.editorial verificationDispute this →
Inspect the evidence

Evidence for (0)

None found.

Evidence against (2)

  • Budget document7 Nov 2025
    The 2026 Budget says an e-procurement system is being created as part of public-finance digitalization.
  • A 2026 Disaster Management Centre procurement notice states that electronic procurement will not be permitted and requires physical proposal delivery.
How assessments are made

One model assembles a fixed evidence file from statements and official documents. A second model assesses the promise from that evidence file, so it cannot choose the evidence that supports its own conclusion.

A promise without evidence remains unassessed. Assessments are automatically published, not editorially reviewed, and every rated promise includes its date, assessor, sources, and a route to dispute the record.